Took a couple days to get my life back in order, went for an interview, have another next week. While sitting at home for a year and getting paid sounds amazing it my be increasingly hard to get a job with that long of a gap in my resume. I still haven't decided but I may go back to work if an opportunity presents itself.
Back to the car....
I received the LCD screen that i would like to use for the dash, I still have to test it out and find an LVDS adapter to drive it via HDMI. I plan to take the screen out of this plastic housing and build it into the gauge cluster. I still have to make sure
Concrete company came on Tuesday, they helped me carry the GTM frame out to the lawn and they started drilling 17 3" holes in the floor in a grid pattern. Once drilled we could see that the problem was even worse toward the back of the garage where there was almost a solid 12" of air under the 2" slab. They then used a high pressure pump to push concrete into the holes. You can even start to see water and concrete start to squish up through the cracks in the floor. The whole operation took 2 hours and cost $1800.
All of the parts are now back from the powder coaters and ready to be riveted to the car. They look amazing. I ended up going with the semi-gloss black, total cost ended up being $600
Leave a comment