2Mar/150
Lift Holes
Rebar done, not the prettiest but functional. I used green epoxy rebar and i sprayed the old rebar with an epoxy coat as well.
Bending the rebar was a little problematic and i managed to catch my leg with my BFH while trying to bend the last piece. I am only walking with a bit of a limp :-).
I picked up 10 bags of 6000 PSI concrete, i bet its not enough but i should get a better idea after i fill the first hole tomorrow.
(about two weeks until the kit arrives... which is perfect because i have some work to finish.
Leave a comment